Vol 26 No 2 (2020)

Published: 2020-02-07

Articles

An improved time-cost trade-off model with optimal labor productivity

Chien-Liang Lin, Yu-Che Lai
Abstract 1117 | PDF Downloads 461 | DOI

Page 113-130

Engineering harmony under multi-constraint objectives: the perspective of meta-analysis

Qiankun Wang, Weiwei Zuo, Qianyao Li
Abstract 1073 | PDF Downloads 321 | DOI

Page 131-146

Page 147-159

Time reduction effects of steel connected precast concrete components for heavily loaded long-span buildings

Ho-Haeng Lee, Ki-Ho Kim, Seunghyun Son, Kwangheon Park, Sunkuk Kim
Abstract 1202 | PDF Downloads 241 | DOI

Page 160-174

Assessing construction labours’ safety level: a fuzzy MCDM approach

Saeed Reza Mohandes, Haleh Sadeghi, Amir Mahdiyar, Serdar Durdyev, Audrius Banaitis, Khairulzan Yahya, Syuhaida Ismail
Abstract 1354 | PDF Downloads 469 | DOI

Page 175-188

Compressive strength prediction of lightweight short columns at elevated temperature using gene expression programing and artificial neural network

Ahmed Ashteyat, Yasmeen T. Obaidat, Yasmin Z. Murad, Rami Haddad
Abstract 1308 | PDF Downloads 335 | DOI

Page 189-199

Bayesian belief network-based project complexity measurement considering causal relationships

Lan Luo, Limao Zhang, Guangdong Wu
Abstract 1248 | PDF Downloads 355 | DOI

Page 200-215